Two changes on one flag, one route or one alert rule inside one window can cause an incident, and
they make both verdicts impossible to read: which of the two moved the error rate? A **change
lease** makes that impossible. When a governed change applies to a production object, it holds a
lease on that object until its post-change watch ends. While the lease stands, a second plan on
the same object is refused, with the reason it was refused and the time it may try again.

A lease only orders writes. It never approves anything, never widens what an agent may do, and is
never an action of its own: it is taken by the apply step of a governed change, inside the same
transaction, so a lease exists exactly when a change applied.

## What is leased

- **The object the change names**: a flag, an alert rule, a monitor, a route, a release. A family
  whose change touches more than its own target (a route group, the services a rollout names)
  states the extra objects, and each is leased.
- **Production only.** An environment your project maps as non-production takes no lease. An
  environment that is not mapped, or not stated, counts as production.
- **Never a whole project or organization.** A setting that touches nothing specific takes no
  lease, so a project-level change never blocks every other change in the project.
- **At most 25 objects per change.** A larger change is refused with `TOO_MANY_LEASES`; split it.

## When a plan is refused

A plan on a leased object is refused before anyone is asked to approve it, with HTTP 409 and
`refusalCode: CHANGE_LEASED`. The refusal names:

| Field | What it says |
| --- | --- |
| `objectKind`, `objectRef` | The object that is leased. |
| `holder` | The operation, principal and act that hold it. |
| `reason` | The holder's own stated reason, cut to 300 characters. |
| `expiresAt`, `retryAt` | When the lease lapses, and when this plan may try again. |

The same check runs again when an approved change applies, so two plans approved at the same
moment cannot both land: one applies, and the other is refused with its approval left unspent.
The holder's own second plan on the same object is refused too: one writer means one writer.

`decision_preview` shows a `lease` block when the object it previews is leased: who holds it, when
it lapses, and whether this act would be refused or would preempt. The block carries no free text;
use `change_leases_list` to read the holder's reason.

## Safety acts always go through

A change that moves toward safety is **never** refused by a lease: a kill switch, a narrowing, a
pause, a rollback. It takes the object over: the holder's lease becomes `contested` (so the
holder's verdict says its window was shared) and the safety act takes its own lease.

A change the classifier derives as a *loosening* is never treated as a safety act, whatever its
verb: pausing an alert rule or disabling a monitor takes protection away, so it waits like any
other plan.

A revert of a change ends that change's lease instead of waiting behind it.

## When a lease ends

- **With its watch.** Once the change's watch opens, the lease ends when the watch ends, and a watch
  that closes early frees the object. This is read, not swept: a worker that is down cannot make a
  lease outlive its change.
- **Released by its holder.** `change_lease.release` lets the principal whose change holds a lease
  let go of it early. Only the holder may release, and a contested lease stays contested.
- **Broken by a person.** `change_lease.break` is human-only: an agent, an OAuth client and a
  delegated session are refused whatever scope they hold. It needs a reason of at least 8
  characters, which is recorded on the audit row; the holder is told; and the holder's verdict reads
  `confounded`, because two writers acted inside its window.
- **When the change fails.** A change whose apply does not complete lets its leases go.

## Changes Bucker did not make

A change that lands on a leased object from outside Bucker, such as a flag flipped in your flag
vendor's own dashboard, marks the lease **contested** and closes every approval pending on that
object as inapplicable (`TARGET_CHANGED`): a yes given before the outside change was a yes to a
world that no longer exists. The contested lease keeps blocking other plans until it lapses.

- The vendor's webhook for a change Bucker itself just applied arrives seconds later. A flip within
  one minute before or two minutes after the holder's apply is read as that echo and contests
  nothing. The cost is stated: an outside change in the same two minutes reads as the echo.
- A flip in an environment your project maps as non-production contests nothing.
- A webhook delivered twice contests nothing the second time.
- A flip reported for one project never reaches a lease in another project or organization.

## What the verdict says about its window

Every post-change verdict carries `windowState` in its evidence:

| `windowState` | Meaning |
| --- | --- |
| `clean` | The change held its object alone for its whole window. |
| `shared` | Another change landed inside the window: an outside change, or a safety act that preempted. |
| `confounded` | A person broke the lease. The window cannot be interpreted. |
| `unleased` | The change took no lease (non-production, or a project-level change). |

`windowState` is evidence only. It never changes the verdict's kind.

## Reading leases

The MCP tool `change_leases_list` (`project:read`, `agents` toolset) lists a project's leases newest
first with a cursor: the object, the holding change and act, the lapse time, the effective state
(`ended` for a lease whose end passed or whose watch closed) and the window state. The holder's
reason and a break reason are text written by people and agents, so both are sanitized and
declared untrusted in the answer. Until the SG-059 review completes, the tool is held: a token a
production path can mint does not list it.

## Review mode

Review mode never lifts a lease refusal: the lease check runs after the approvals engine, so a deny,
an invariant, an ask floor or a dual-control requirement is decided exactly as before, and a lease
only adds a refusal of its own.